AI Power & Grid: A Source-Backed Research Baseline
Constraint Alpha starts the AI power research process with the physical system: firm generation, grid connection, power distribution, cooling, and the qualified equipment needed to deliver usable megawatts to a data center.
Change record
What changed
- The existing AI Power & Grid map is now available as a versioned research note for both human readers and machine consumers.
- The note separates public evidence from member-only thesis, risk, catalyst, and falsification fields.
Public interpretation
Why it matters
AI infrastructure growth can be delayed by equipment availability, interconnection, cooling, and project execution even when compute demand remains strong. Mapping those dependencies makes the research question testable instead of treating every electrical supplier as equivalent exposure.
Primary-source trail
Evidence
- Eaton data-center electrical portfolio
switchgear, UPS, busway, and power-distribution relevance to data centers · As of 2026-07-12
- GE Vernova gas-power portfolio
long-cycle firm-generation equipment within the AI power system · As of 2026-07-12
- Vertiv AI infrastructure portfolio
high-density data-center power and thermal-management equipment · As of 2026-07-12